RSS.Social

Machine Readable (Blog)

follow: @[email protected]

Posts

System, process, system

Event Recap: Time to Power

Speed to Power, Need for Power

FERC Blinked. State PUCs Determine What Happens Next

Building the Stack: Turning RAG Pipelines into enterprise-grade Data Subscriptions

Sub-stantial growth in Texas

Halcyon Antique Roadshow

Crawl, Walk, Run (Again)

Crawl, Walk, Run

Halcyon Raises $21 Million Series A

The BESS(T) Gets Better

Agentic Elasticity

Inferring flexibility

Reflections on a Boom

Five for Five

Agentic Alerts

How to spend $72 million

The Annual Deck

Onto Something

Simply the BESS(T): Halcyon’s Latest Data Subscription

Parsing FERC RM26-4-000: Large Load Interconnection

Grid Turkeys

Time, productivity, intelligence

Tracking US Utility Cost of Capital

Wanting power and protecting ratepayers

Texas, Energy, and Power

From Spreadsheets to Subscriptions

Data Centers and Potatoes

From Disparity to Data

New Data Subscriptions

Search: Everything Old is New Again

The New Reality of Power Generation

Introducing Halcyon Search

Back to School: 2025-26 Energy Curriculum

Vectors and Vectors

Flexible Load Benefits or Not?

Fat Tails and Long Tails

ChangeLog