Machine Readable (Blog)
System, process, system
Event Recap: Time to Power
Speed to Power, Need for Power
FERC Blinked. State PUCs Determine What Happens Next
Building the Stack: Turning RAG Pipelines into enterprise-grade Data Subscriptions
Sub-stantial growth in Texas
Halcyon Antique Roadshow
Crawl, Walk, Run (Again)
Crawl, Walk, Run
Halcyon Raises $21 Million Series A
The BESS(T) Gets Better
Agentic Elasticity
Inferring flexibility
Reflections on a Boom
Five for Five
Agentic Alerts
How to spend $72 million
The Annual Deck
Onto Something
Simply the BESS(T): Halcyon’s Latest Data Subscription
Parsing FERC RM26-4-000: Large Load Interconnection
Grid Turkeys
Time, productivity, intelligence
Tracking US Utility Cost of Capital
Wanting power and protecting ratepayers
Texas, Energy, and Power
From Spreadsheets to Subscriptions
Data Centers and Potatoes
From Disparity to Data
New Data Subscriptions
Search: Everything Old is New Again
The New Reality of Power Generation
Introducing Halcyon Search
Back to School: 2025-26 Energy Curriculum
Vectors and Vectors
Flexible Load Benefits or Not?
Fat Tails and Long Tails
ChangeLog